Abstract:In the view of the problem that the expanding capacity of Jianbi pump station is large while the size of its inlet and outlet conduit is not plentiful,some reforms are done on the conduits to improve the station efficiency.According to unit experimenting research on several reform schemes,the result is that the small-scale reform has little effect on the efficiency.And at last,by selecting suitable hydraulic mo-(dels,the c)apacity is increased by 40 m~3/s which resulting in great economic and social effect.
陈卫平. 谏壁泵站改造进出水流道设计方案试验研究[J]. 排灌机械工程学报, 2006, 24(3): 17-19.
CHEN Wei-ping. Research on reform design schemes for inlet and outlet conduit for Jianbi pump station. Journal of Drainage and Irrigation Machinery Engin, 2006, 24(3): 17-19.