Abstract:The reason of the abnormal startup of electric motor in Jiangsu Huaian the Third Pumping Station is analyzed and found. The quality problem is resolved by technology improvement. And it suggests that to ensure the new building project has high quality, safety, and high efficiency it must attach importance to the every fine component’s design, must research the construct technics, and must control the products quality strictly during the pumping station building .
田谷. 泵站机组不能正常启动原因分析及解决办法[J]. 排灌机械工程学报, 2003, 21(5): 27-28.
Tian Gu. Reason for Unable to Startup Normally of Electric Motor and its Solution. Journal of Drainage and Irrigation Machinery Engin, 2003, 21(5): 27-28.