Abstract: Based on the analysis on the disadvantage of the formulas representing cross-section velocity distribution uniformity of inlet conduit of water pumping station,two formulas,namely,the cross-section of effective flow area ratio and the flow uniformity were established by taking river flow characteristics into consideration.Hydraulic optimizations for stilling basin and wing wall of an unilaterally-arranged-pump-gateway were conducted with 3D steady numerical simulation by regarding the formulas as objective function.The results of numerical simulation were verified through the model experiment.According to the engineering condition,it is concluded that the excessive length of the stilling basin has a negative impact on the effect of energy dissipation.Setting auxiliary devices for stilling basin and reducing the length of the wing wall are good choice.Riprap protection at the end of the apron extension can solve the problem that water velocity exceeds the resisting flow velocity of riverbed.
[1]陈灿辉,赖翼峰,李一平.低水头水电站枢纽拦河闸消力池优化设计[J].广东水利水电,2005(2):22-27.Chen Canhui,Lai Yifeng,Li Yiping.Optimizing design of stilling pool in low-head sluice of power station across river[J].Guandong Water Resources and Hydropower,2005 (2):22-27.(in Chinese)[2]吴宇峰.蘑菇湖水库消力池的失事原因分析[J].排灌机械,2003,21(6):27-29.Wu Yifeng.Analysis on wreckage of moguhu stilling pool[J].Drainage and Irrigation Machinery,2003,21(6):27-29.(in Chinese)[3]Hayde L.Hydraulics of double stilling basin systems[J].Periodica Polytechnica SER.CIV.ENG.,2001,45(1):151-170.[4]许唯临,廖华胜.水垫塘三维紊流数值模拟及消能分析[J].水动力学研究与进展,1996,11(5):561-569.Xu Weilin,Liao Huasheng.Numerical simulation of 3D turbulent flows of plunge pool and energy dissipation analysis[J].Journal of Hydrodynamics,1996,11(5):561-569.(in Chinese)[5]Margeirsson B.Computational modeling of flow over a spillway[D].Sweden:Chalmers University of Techno-logy,2007.[6]陆林广,刘军,梁金栋,等.大型泵站出水流道三维流动及水力损失数值计算[J].排灌机械,2008,26(3):51-54.Lu Linguang,Liu Jun,Liang Jindong,et al.Numerical simulation of 3D turbulent flow and hydraulic loss in outlet conduit of large pumping station[J].Drainage and Irrigation Machinery,2008,26(3):51-54.(in Chinese)[7]Bos M G.Discharge measurement structures,[M].Third revised edition,Wageningen:International Institute for Land Reclamation and Improvement,1989:379-384.[8]成立,刘超.泵站进出水流道优化设计目标函数研究[J].水泵技术,2007(3):39-42.Cheng Li,Liu Chao.Study on Object Function for optimal design to inlet conduit of pumping station[J].Pump Technology,2007(3):39-42.(in Chinese)[9]张林.城市排水泵站侧向进水流动计算分析与水力优化研究[D].南京:河海大学,2008.[10]Morteza S,Helbar S,Farhoudi J.Shear velocity method to riprap sizing at downstream of stilling basins[J].World Applied Sciences Journal,2008,4(1):116-123.