Abstract:In order to solve the overload problem of the electric motor of the muddy water source pumping station, the determinative factors that affect the match power of the electric motor was analyzed, and the correction value of the reserve factor of the electric motor is presented. This was verified in Shanxi Jamakou water resource pumping station , and it has some referential value to the construction and reconstruction of the sediment-laden water source pumping station.
卫庆虎;王建刚;刘观灯. 多泥沙水源泵站电动机配套功率的确定[J]. 排灌机械工程学报, 2004, 22(5): 38-39.
WEI Qing-hu, WANG Jiang-ang, LIU Guan-deng. Determination of Match Power in Electric Motor of the Muddy Water Source Pumping Station. Journal of Drainage and Irrigation Machinery Engin, 2004, 22(5): 38-39.