长距离泵站水锤分析及管线布置对水锤的影响
赵斌1, 胡斌超1, 刘有亮1, 史广泰2, 王继堂3
Analysis of water hammer phenomena phenomena in long-distance pumping stations and impact of pipeline configuration on its occurrence
排灌机械工程学报
.
2024, (11): 1112
-1119
.
DOI: 10.3969/j.issn.1674-8530.24.0023