南水北调东线宝应泵站机电设备安装质量检测
汤正军
Detection of installation quality of electromechanical equipments for Baoying pumping station in Eastern Route of South-to-North Water Transfer
TANG Zheng-jun
排灌机械工程学报
.
2007, (3): 27
-30
.
DOI: 10.3969/j.issn.1674-8530.2007.03.007