Abstract:By the condition of the renovated and rebuild water gate station which locates on LiXia River in HaiAn county, and combining the design characteristics on this project, this paper put forward the adoption of correlative constructing technique in such project. This paper also analyse and evaluate the technique application from formulated idea, technological process, superiority on technology, application range, economic profits, and constructing time. Which can be as a sample for build such similar project and this kind of water gate station, it also can be a basis for carrying out the typical technique on this kind of project in the future.
闵贵德. 闸站施工中典型工法的应用[J]. 排灌机械工程学报, 2004, 22(2): 24-26.
MIN Gui-de. The Typical Technique Application in Water Gate Station Construction. Journal of Drainage and Irrigation Machinery Engin, 2004, 22(2): 24-26.