Abstract:Through survey methods of data collection, on-site discussions and field surveys, the passenger flow of near 20 typically integrated passenger transportation hubs currently in operation in China was surveyed and counted. Focusing on the analysis of the typical layout patterns of Shenzhen North Station, Tianjin Station, Beijing South Station and Nanjing South Station, according to the transfer mode of passenger flow in the integrated passenger transportation hubs, the existing railway-led connection layout modes in China were classified. The advantages and disadvantages of the connection layout modes among different transfer modes were compared and analyzed, and the scope of application was defined. The results show that the layout modes of integrated passenger transportation hubs in China are mainly divided into four categories of planar integrated layout, planar separated layout, three-dimensional layout and comprehensive layout. With the continuous increasing in the requirements of urban comprehensive transportation service levels and the demand for social public satisfaction, the three-dimensional layout mode has obvious future development advantages.
LU X M, JIANG W P. Seamless connection and functionalities of passenger transport terminals [J]. Urban Transport of China, 2014, 12(1):1-4.(in Chinese)
[2]
王章华,谢明.综合客运枢纽设计问题与对策[J].交通企业管理,2018,33(5):33-35.
WANG Z H, XIE M. Design problems and countermeasures of integrated passenger transportation hub[J]. Transportation Enterprise Management, 2018, 33 (5): 33-35.(in Chinese)
[3]
BATES E G. A study of passenger transfer facilities[J]. Journal of the Transportation Research Board, 1978,662:23-25.
[4]
GIACOMINI C, LONGO G. Optimal terminal layout configuration:a new approach[J]. Transportation Research Procedia, 2014, 2:685-690.
[5]
SOLAK S, CLARKE J B, JOHNSON E L. Airport terminal capacity planning[J]. Transportation Research Part B,2009, 43(6):659-676.
[6]
CORREIA A R, WIRASINGHE S C, DE BARROS A G. A global index for level of service evaluation at airport passenger terminals[J]. Transportation Research Part E, 2008, 44(4):607-620.
[7]
SUBPRASOM K, SENEVIRATNE P N, KILPALA H K. Cost-based space estimation in passenger terminals[J]. Journal of Transportation Engineering, 2002, 128(2):191-197.
LI Y, GE Y. Study on transfer facilities layout of railway passenger transport hub with cross lines[J]. Railway Construction Technology, 2018 (11): 8-11, 42.(in Chinese)
LIU X M. Planning leads the synergy and integration to create an upgraded version of the comprehensive transportation service:interpretation of the "13th five-year" development plan for integrated transportation services [J]. Finance & Accounting for Communications, 2016(8): 4-9.(in Chinese)
[10]
李方卫.深圳北站综合交通枢纽[J].城市交通,2016,14(3):2.
LI F W. Shenzhen north station comprehensive transportation hub[J]. Urban Transport of China, 2016, 14(3):2.(in Chinese)