排灌机械工程学报
   Home  About Journal  Editorial Board  Instructions for Authors    中文 
Journal of Drainage and Irrigation Machinery Engin  2012, Vol. 30 Issue (3): 330-334    DOI: 10.3969/j.issn.1674-8530.2012.03.016
Article Current Issue| Next Issue| Archive| Adv Search |
Comparison of power generation scheme and benefit analysis for pump units in Jiangdu No.3 Pumping Station in reverse mode
 WEI  Qiang-Lin1, HAN  Yong-Geng1, CHOU  Bao-Yun2, HE  Shu-Quan2
(1. Jiangdu Water Conservancy Project Bureau of Jiangsu Province, Yangzhou, Jiangsu 225200, China; 2. School of Energy and Power Engineering, Yangzhou University, Yangzhou, Jiangsu 225127, China)

Copyright © 2011 Journal of Drainage and Irrigation Machinery Engineering
Support by Beijing Magtech Co.Ltd   E-mail: support@magtech.com.cn