Abstract:Baoying Pump Station was the first-built project in Southto-North Water Transfer Project.It provides an example for the construction of other pump stations.The significance and necessity of the detection of installation quality of electromechanical equipments are presented simply.The characteristics of the detection and installation quality of electromechanical equipments are analyzed.The preparation work before the detection in the detection for the detecting institution,is pointed out.The specific work of the detecting institution of Baoying Pump Station is explained.It provides advisable experience and direction to detect the installation quality of electromechanical equipment of the pump station for the future.South-to-North Water Transfer Projects;Baoying Pump Station;electromechanical equipment;installation;detection quality
汤正军. 南水北调东线宝应泵站机电设备安装质量检测[J]. 排灌机械工程学报, 2007, 25(3): 27-30.
TANG Zheng-jun. Detection of installation quality of electromechanical equipments for Baoying pumping station in Eastern Route of South-to-North Water Transfer. Journal of Drainage and Irrigation Machinery Engin, 2007, 25(3): 27-30.