水面蒸发对南水北调江苏段调水效率的影响
仇宝云1,王斐1,冯晓莉1, 黄海田2,杨兴丽1
( 1.扬州大学能源与动力工程学院,江苏 扬州 225127; 2.江苏省水利厅科学技术委员会,江苏 南京 210029)
Effects of water surface evaporation on water transfer efficiency for Jiangsu section of South- to- North Water Diversion Project
Qiu Baoyun1,Wang Fei1,Feng Xiaoli1,Huang Haitian2,Yang Xingli1
(1.School of Energy and Power Engineering,Yangzhou University,Yangzhou,Jiangsu 225127,China;2.Science & Technology Commission of Water Resources Department of Jiangsu Province,Nanjing,Jiangsu 210029,China)
 全文: PDF (313 KB)   HTML (1 KB)   输出: BibTeX | EndNote (RIS)      背景资料
摘要 为了掌握南水北调东线江苏境内工程输水河道和调蓄湖库水面蒸发损失水量,及其所造成的泵站机组损失功率,了解水面蒸发对工程调水效率的影响,分析比较了适用于工程所在地区的水面蒸发量计算模型和计算公式,计算了工程沿线输水河道和调蓄湖库的水面蒸发量,分析了工程水面蒸发量的时间和空间分布特征.通过积分,计算了水面蒸发造成的各梯级泵站的流量损失和输入功率损失,求解并分析了水面蒸发对整个江苏段工程调水效率的影响.结果表明:工程沿线水面年蒸发量自南向北、西北方向逐渐递增;蒸发量夏季最高,冬季最低;全线平均水面年蒸发量为862.2 mm.洪泽湖、骆马湖、白马湖和输水河道蒸发损失水量分别占总蒸发损失水量的77.7%,13.3%,3.6%和5.4%,蒸发损失水量约占源头泵站抽水量的17.46%,使工程平均调水效率降低10.33%.调水工程可以考虑采用管道输水,从而避免蒸发损失.
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
仇宝云
王斐
冯晓莉
黄海田
杨兴丽
关键词南水北调东线   江苏段   输水河道   水面蒸发量   工程调水效率   调蓄湖库     
Abstract: In order to know the evaporating capacity of channel and lake reservoir water surface along Jiangsu section of the Eastern Route of South-to-North Water Diversion Project(JERP),its power loss of the pumping stations and its influence on water transfer efficiency of JERP,evaporating capacity calculating models and formulae which are suitable for the areas where JERP locates were analyzed and compared.Evaporating capacity of every channel and lake reservoir water surface along JERP was calculated by integral.Both spacial and temporal distribution characteristics of the evaporating capacities of water surfacs were analyzed.The discharge loss and input power loss of every step pumping stations caused by water surface evaporation were calculated.The effect of water surface evaporation on water transfer efficiency of JERP was computed and analyzed.The results show that the evaporating capacities of water surfaces gradually increase from south to north and north- west,and are largest in summer and least in winter.The annual average evaporating capacity of water surfaces amounts to 862.2 mm.The evaporation water volume losses of Hongze Lake,Luoma Lake,Baima Lake and water transfer channels are 77.7%,13.3%,3.6% and 5.4% of the total evaporation water volume loss respectively.17.46% of the water pumped by source pumping stations loses for evaporation,which causes water transfer efficiency of JERP to decrease by 10.33%,and that is a considerable energy loss.Pipelines could be considered for the great water transfer projects which could avoid evaporating capacity of water surface.
Key wordsEastern Route of South-to-North Water Diversion   Jiangsu section   water transfer channels   evaporating capacity of water surface   water transfer efficiency of project   lake reservoirs   
收稿日期: 2010-07-27; 出版日期: 2011-05-30
基金资助:

全国百篇优秀博士学位论文作者专项基金资助项目(2007B41);江苏省水利科技重点项目(2008054)

通讯作者: 仇宝云( 1962-) , 男, 江苏扬州人, 教授, 博士生导师( yzdxqby@ sohu.com) , 主要从事大型泵站及其调水研究.   
引用本文:   
仇宝云,王斐,冯晓莉等. 水面蒸发对南水北调江苏段调水效率的影响[J]. 排灌机械工程学报, 2011, 29(3): 219-223.
CHOU Bao-Yun,WANG Fei,FENG Xiao-Li et al. Effects of water surface evaporation on water transfer efficiency for Jiangsu section of South- to- North Water Diversion Project[J]. Journal of Drainage and Irrigation Machinery Engin, 2011, 29(3): 219-223.
 
[1] 田野.架空输电线路输电损耗的差异及降损措施[J].黑龙江电力,2010,32(6):441-443.
[2] Pezzini Paola,Gomis-Bellmunt Oriol,Frau-Valenti Joan,et al.Energy efficiency optimization in distribution transformers considering Spanish distribution regulation policy[J].Energy,2010,35(12):4685-4690.
[3] 陆永泉 朱庆元 仇宝云 等.大套第三抽水站辅助设备能耗计算分析[J].排灌机械工程学报,2010,28(4):340-343.
[4] Feng Xiaoli,Qiu Baoyun,Cao Haihong,et al.Optimal operation for Baoying pumping station in East Route Project of South-to-North Water Transfer[J].Chinese Journal of Mechanical Engineering,2009,22(1):78-83.
[5] Moreno M A,Carrión P A,Planells P,et al.Measurement and improvement of the energy efficiency at pumping stations[J].Biosystems Engineering,2007,98(4):479-486.
[6] Lowe L D,Webb J A,Nathan R J,et al.Evaporation from water supply reservoirs:An assessment of uncer-tainty[J].Journal of Hydrology,2009,376(1/2):261 -274.
[7] 李爱贞 刘厚凤.气象学与气候学基础[M].北京:气象出版社,2001.92-93.
[8] 中水淮河工程有限责任公司 中水北方勘测设计研究有限责任公司.南水北调东线第一期工程项目建议书[R].南京:江苏省水利厅,2004..