Research on reform design schemes for inlet and outlet conduit for Jianbi pump station |
CHEN Wei-ping |
Zhenjiang Engineering Survey and Design Institute, Zhenjiang, Jiangsu 212003, China |
|
|
Abstract In the view of the problem that the expanding capacity of Jianbi pump station is large while the size of its inlet and outlet conduit is not plentiful,some reforms are done on the conduits to improve the station efficiency.According to unit experimenting research on several reform schemes,the result is that the small-scale reform has little effect on the efficiency.And at last,by selecting suitable hydraulic mo-(dels,the c)apacity is increased by 40 m~3/s which resulting in great economic and social effect.
|
Received: 08 August 2013
|
|
|
|
[1] 江苏大学流体机械工程技术研究中心.湖西引排谏壁抽水站增容除险改造工程流道优化方案的数模计算分析[Z],2002:1[2] 扬州大学江苏省水利动力工程重点实验室.谏壁抽水站综合技术改造水泵装置模型试验研究报告[R].扬州,2002[3] 江苏省水文水资源勘测局镇江分局.湖西引排谏壁抽水站除险增容改造工程水力参数测试成果报告[R],2005[4] 严登丰.泵站过流设施与截流闭锁装置[M].北京:中国水利水电出版社,2000[5] 张进国,刘海清,梁兴.湖南苏家吉泵站进水流道流态模拟[J].排灌机械,2005,23(6):19-22[6] 陆林广,祝婕,冷豫.泵站进水流道模型水力损失测试[J].排灌机械,2005,23(4):14-17[7] 陆亦林,冷豫,吴开平.泵站进水流道内部流态模型试验方法研究[J].排灌机械,2005,23(3):17-19 |
|
|
|