Effect of water hammer to pressure pipes for pumping accidents |
YAO Qing-yun, LI Zhi-min |
College of Civil and Conservancy Engineering, Ningxia University, Yinchuan, Ningxia 750021, China |
|
|
Abstract An introduction of the Dazhanchang pumping station and an investigation of the broken pressure pipes caused by pumping accident in the pumping station are presented.According to the theory of the water hammer and its characteristic,the calculating model of the pumping accident is built.The change of the water pump parameter and the piping pressures in pumping accident transition process are simulated,and the highest and lowest head envelope curves are obtained.By analysing the result combined with the local investigation,the main reason is deduced.Pumping accidents result in excessively high water hammer pressure.The negative pressure occurs along pipes.The quantity of the pipes can not meet the design requirement and so on.The measures to deal with the problem are given as following: changing the destructive pipes and installing the air inlet-outlet valve on 3~# and 6~# anchor blocks can avoid the excessively high negative pressure.the water hammer;pumping accident;pressure pipe;head envelope curve
|
Received: 08 August 2013
|
|
|
|
[1] 金锥,姜乃昌,汪兴华.停泵水锤及其防护[M].北京:中国建筑工业出版社,2004:1[2] 栾鸿儒.水泵及水泵站[M].北京:水利电力出版社,1993:262-266[3] 梁兴,刘梅清,张进国.空气罐对输水管道水锤的防护研究[J].排灌机械,2005,23(6):16-18[4] 蒋桂林,周龙才,冯军.惠州深能源丰达电厂取水工程水锤计算与防护[J].排灌机械,2005,23(1):15-18[5] 贾伟智.有压输水管道的排(进)气问题研究[J].人民黄河,2004,26(9):24-26[6] 耿灵生,郝晓晖.多功能水泵控制阀在水厂的应用[J].排灌机械,2004,22(4):20-22[7] 杨远东,邓志光.停泵水锤计算及其防护措施[J].中国给水排水,2000,16(5):29-32 |
|
|
|