|
|
Determination of economical operation program at draining pump station |
LIU Jia-chun1, 2, ZHANG Zi-xian2, ZHANG Mu-fei3, CHEN Ping-long3, WANG Zhi-hui3 |
1.Jiangsu Research and Development Centre of Architectural Energy-Saving Technology, Xuzhou, Jiangsu 221008, China; 2.Xuzhou Architectural Technical Collage, Xuzhou, Jiangsu 221008, China; 3.Water Conservancy Bureau of City of Xuzhou, Xuzhou, Jiangsu 221008, China |
|
|
Abstract After an axial-flow pump station is completed,the water levels of inlet and outlet sumps,head of pump station and capacity of pump station will all change with changes in the irrigation and drainage area,cropping pattern,hydrological and meteorology effects,resulting in low efficiency and high energy consumption.The keep the pump stastion running at economic condition a mathematical model and restraining condition based on system analysis and the solving methods are given for determining the economical operation alternative. By applying the model to reality,the efficiency of pump station is improved.axial-flow pump station;economical operation;mathematic model;calculate software
|
Received: 08 August 2013
|
|
|
|
[1] 曾庆祝.农村机电泵站存在问题及对策[J].排灌机械,2006,24(1):46-49[2] 刘家春.泵站经济运行方案的确定[J].水泵技术,1998(2):42-43[3] 袁丹青,黄良通,丛小青.防洪排涝泵站最优调度模型的研究[J].排灌机械,2002,20(6):16-17[4] 刘家春.水泵与水泵站[M].北京:中国水利水电出版社,1998:44-45[5] 姜乃昌.水泵及水泵站[M].北京:中国建筑工业出版社,1996:93[6] 马太玲,袁保惠.灌排泵站变频调速实用性及经济性分析[J].排灌机械,2001,19(2):19-20[7] 姚志青,马新华.中小型泵站运行参数测量方法[J].排灌机械,2005,23(1):25-27 |
|
|
|