|
|
The Choice of Umbrella-Gear Transmission Routing Through Pump Unit′sStructure Types in Luyang Pumping Station Project of the ChannelWhich Leading Huaihe River Into Sea |
YANG Hong-qun1, HUANG Liang-yong2, XIA Jue3, WANG Jian2 |
1.Technology consultation center of water conservancy project in Jiangsu province, Naijing 210000, China; 2. Building and managing bureau of channel which leading Huaihe river into sea in Jiangsu province, Naijing 210000, China; 3.Yancheng institute of irrigation works, Yancheng 224000, China |
|
|
Abstract The character of the hydraulic model, gear, axletree, seal and shaft coupling which adopted in Huge umbrella-gear transmission routing through unit are introduced. The merits of the selected unit which has simple structure, convenience run and maintenance, less install task and high efficiency are expatiated. It supplies reference for the design of pumping station unit.
|
Received: 08 August 2013
|
|
|
|
[1] 兰才有,等.南水北调东线工程水泵机组选型方法探讨[J].排灌机械,2004,22(1):1-7[2] 厉明祥.南水北调大型泵结构设计研究[J].排灌机械,2003,21(3):1-5 |
|
|
|