Abstract:In order to study the effect of temperature control measures when pouring concrete dams at high temperature and find suitable temperature control measures for high-temperature construction environments, combined with the actual project, using finite element method, we simulate the temperature stress during the construction and operation phases of a RCC gravity dam and analyze the temperature and stress field of the dam at different cooling water temperatures and pouring temperature. Results show that the dam temperature stress is greatly influenced by pouring temperature and cooling water temperature: in basic restraint areas, while the pouring temperature reduced from 25℃ to 23℃ and the cooling water temperature reduced from 20℃ to 15℃, the highest temperature in dam body reduced from 36.9℃ to 34.6℃ and the maximum temperature stress reduced from 1.64MPa to 1.40MPa. The result meets the requirement of temperature control and crack prevention of the dam. It can be seen that when concrete dams are built in high-temperature areas, the temperature and temperature stress of the dam can be effectively controlled at relatively high pouring temperature and cooling water temperature. The present result is of important value in simplifying temperature control measures, shortening the construction period and reducing the investment.
张晓飞,王晓平*,张昕,刘茜,黄宇,李守义. 热带高温地区碾压混凝土重力坝温控措施[J]. 排灌机械工程学报, 2019, 37(10): 863-869.
ZHANG Xiaofei, WANG Xiaoping*, ZHANG Xin, LIU Qian, HUANG Yu, LI Shouyi. Temperature control of RCC gravity dam in tropical high-temperature area. Journal of Drainage and Irrigation Machinery Engin, 2019, 37(10): 863-869.
[1]李明超, 张梦溪, 王孜越. 考虑诱导缝的碾压混凝土重力坝控裂结构温度场与温度应力数值分析[J]. 水利学报, 2017,48(5):551-559.
LI Mingchao, ZHANG Mengxi, WANG Ziyue. Nume-rical analysis of temperature field and thermal stress of the crack control structure with induced joint of RCC gravity dam[J]. Shuili xuebao, 2017,48(5):551-559.(in Chinese)
[2]LIU Xinghong, DUAN Yin, ZHOU Wei, et al. Modeling the piped water cooling of a concrete dam using the heat-fluid coupling method[J]. Journal of engineering mechanics, 2013,139(9):1278-1289.
[3]YANG Jian, HU Yu, ZUO Zheng, et al. Thermal analysis of mass concrete embedded with double-layer staggered heterogeneous cooling water pipes[J]. Applied thermal engineering, 2012,35(1):145-156.
[4]MYERS T G, FOWKES N D, BALLIM Y. A mathematical analysis of the effect of piped water cooling in concrete[J]. Journal of engineering mechanics, 2009,135(12):1375-1383.
[5]SABBAGH Y S R, WEGIAN F M, GHORBANI E. Investigation of the embedded cooling pipe system effects on thermal stresses of the mass concrete structures using two phase finite element modeling[J]. Kuwait journal of science & engineering, 2008, 35(2):1-18.
[6]孙维刚, 倪富陶, 刘来君, 等. 大体积混凝土水化热温度特征数值分析[J]. 江苏大学学报(自然科学版), 2015,36(4):475-479.
SUN Weigang, NI Futao, LIU Laijun, et al. Numerical analysis of hydration heat temperature characteristics of massive concrete[J]. Journal of Jiangsu University(na-tural science edition), 2015,36(4): 475-479.(in Chinese)
[7]谢祥明, 郭磊. 高温地区碾压混凝土重力坝的施工期温度裂缝控制[J]. 天津大学学报, 2011,44(6):504-510.
XIE Xiangming, GUO Lei. Thermal cracking control of RCC gravity dam constructed in high air temperature and dry area[J]. Journal of Tianjin University, 2011,44(6):504-510.(in Chinese)
[8]朱伯芳. 大体积混凝土温度应力与温度控制[M]. 北京:中国电力出版社, 1999.
[9]朱伯芳. 论混凝土坝的水管冷却[J]. 水利学报, 2010,41(5):505-513.
ZHU Bofang. On pipe cooling of concrete dams[J]. Journal of hydraulic engineering, 2010,41(5):505-513.(in Chinese)
没有找到本文相关文献
江苏大学梦溪校区(镇江市梦溪园巷30号)图书馆5楼 0511-84440893
传真0511--84440033 Copyright 江苏大学杂志社 2010-2015 All
Rights Reserved