Environmental measurement scheme of underground powerhouse in large pumped storage power station
XUE Xiaobing1, SONG Jinhong1, JIANG Kun1, DI Hongwei1, LU Ting1, ZHOU Yang2, WANG Pei2, XU Chang2, ZHENG Yuan2
1.East China Yixing Pumped Storage Power Co., Ltd., Yixing, Jiangsu 214205, China; 2.College of Energy and Electrical Enginee-ring, Hohai University, Nanjing, Jiangsu 211100, China
Abstract:In order to evaluate the temperature and humidity control effects in the underground powerhouses for a huge pumped storage power station, increase the design levels of operation environmental comfort and effects on the electromechanical equipment safety. These were analysed for the structure characters of the underground main powerhouse, generatrix cavern, main transformer cavern and air exhaust channel from Yixing pumped storage power station. Due to the performance parameters analysis requirements for the ventilation, inner air circulation and the temperature and humidity controls for the underground main powerhouses and main caverns, suitable measurement instruments were respectively chosen for the temperature, humidity and noise parameters, the measurement schemes were also designed respectively. After preliminary measurement and analysis, it is obtained that the measurement instruments chosen in the project are moderate price, high precision and convenient to use, meanwhile, measurement system and schemes could be satisfied with the temperature and humidity evaluation. Measurement instruments and schemes should be combined with powerhouse structure and air condition system requirements, and this paper can provide references for similar power station ventilation and air conditioning system measurement and performance analysis.
[1]MATTMANN M, LOGAR I, BROUWER R. Hydropo-wer-externalities: a meta-analysis[J]. Energy economics, 2016,57:66-77.[2]郭晓娜,陈同法.科学定位本质功能促进抽水蓄能建康快速发展[J].水力发电,2015,41(6):1-4. GUO Xiaona,CHEN Tongfa.Orienting the essential function scientifically to promote the healthy and rapid development of pumped storages[J].Water power,2014,41(6):1-4.(in Chinese)[3]KAO Shih-Chieh, SALE Michael J, ASHFAQ Moetasim, et al. Projecting changes in annual hydropower generation using regional runoff data: an assessment of the United States federal hydropower plants[J]. Energy,2015,80:239-250.[4]张华玲.水电站地下厂房热湿环境研究[D].重庆:重庆大学,2007.[5]付祥钊, 陈金华, 熊翰林.琅琊山水电站地下主厂房气流组织研究[J].暖通空调,2005,35(12):80-83. FU Xiangzhao,CHEN Jinhua,XIONG Hanlin.Air distribution in underground main workshop of Langya Mountain hydroelectric power station[J].Heating ventilating & air conditioning,2005,35(12):80-83.(in Chinese)[6]ZHANG H L, FU X Z. Hydrothermal absorption and desorption of deep underground hydropower station envelopes [J]. Tunneling and underground space technology, 2011,26:398-405.[7]肖益民,林婷莹,徐蒯东.地下水电站主厂房通风空调系统设计风量的确定[J].暖通空调,2014,44(12):27-31 XIAO Yimin, LIN Tingying, Xu Kuaidong. Determination of air volume of ventilation and air conditioning system in main powerhouse of underground hydropower station [J]. Heating ventilating & air conditioning,2014,44(12):27-31.(in Chinese)[8]肖益民,刘琳,徐蒯东.地下水电站通风网络设计与风机匹配[J].暖通空调,2015,45(2):43-47. XIAO Yimin, LIU Lin, XU Kuaidong.Ventilation network design and fan matching in underground hydropo-wer stations[J].Heating ventilating & air conditioning, 2015,45(2):43-47.(in Chinese)[9]LI Angui,LIU Zhijian,ZHANG Jianfei,et al.Reduced-scale model study of ventilation for large space of gene-ration floor in HOHHOT underground hydropower station[J]. Energy & buildings, 2011,43:1003-1010.[10]LI Angui, YANG Changqing, REN Tong.Modeling and parametric studies for convective heat transfer in large,long and rough circular cross-sectional underground tunnels[J]. Energy and buildings,2016, 127:259-267.[11]YU Yanshun, ZHANG Shaofan, LI Xianting.An improved model and the thermodynamic calculation method for tailrace tunnel ventilating system in hydropower station[J]. Energy conversion and management,2009, 50(8):2060-2066.[12]YU Yanshun, CAO Lin, LI Xianting, et al. Modeling of heat and mass transfer of tunnel ventilation in hydropo-wer station[J]. Applied thermal engineering,2015,90:45-53.[13]LIU Yicai, WANG Shouchuan, DENG Yangbing, et al. Numerical simulation and experimental study on ventilation system for powerhouses of deep underground hydropower stations[J]. Applied thermal engineering, 2016, 105:151-158.[14]华东勘测设计研究院.江苏宜兴抽水蓄能电站通风空调系统设计专题报告[R].杭州.2003:1-2.[15]DL/T5165-2002 水力发电厂厂房采暖通风与空气调节设计规程[S].北京:中国电力出版社,2003.