|
2013, Vol. 31(2): 128-131 DOI: 10.3969/j.issn.1674-8530.2013.02.008 | ||
Optimization of misaligned guide vanes scheme of pumpturbine | ||
XIAO Ruo-Fu, SUN Hui, YANG Wei, LIU Wei-Chao, WANG Fu-Jun | ||
(1.College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083, China; 2.Dongfang Electric Machinery Co. Ltd., Deyang, Sichuan 618000, China) |
||
Received 2012-05-17 Revised null | ||
Supporting info | ||
|