|
2024, Vol. 42(3): 250-255 DOI: 10.3969/j.issn.1674-8530.22.0059 | ||
Water hammer protection measures for long-distance water transmission projects during pump stop with multiple water diversions outlets | ||
YANG Chunxia1*, LI Qian1, MA Jingtong2, ZHENG Yuan1, GENG Weiqiang1, ZHANG Zhen1 | ||
1. College of Energy and Electrical Engineering, Hohai University, Nanjing, Jiangsu 211100, China; 2. China Water Northeastern Investigation, Design & Research Co., Ltd., Changchun, Jilin 130021, China | ||
Received 2022-03-14 Revised null | ||
Supporting info | ||
|