|
2018, Vol. 36(6): 467-471 DOI: 10.3969/j.issn.1674-8530.16.0116 | ||
Simulation on performance of a centrifugal pump during rapid startup period | ||
WU Shaoke1*, ZHANG Yuewen2, ZHANG Peng2 | ||
1.Water Transport Planning and Design Co, . Ltd., China Communications Construction Company Limited, Beijing 100007, China; 2.College of Marine Engineering, Dalian Maritime University, Dalian, Liaoning 116026, China | ||
Received 2016-05-24 Revised 2018-05-04 | ||
Supporting info | ||
|