|
|
A Preliminary Analysis of the Running Management for the Engineering of Water Transforming from the Yangtze River to the North |
HUANG Hai-tian1, QIU Bao-yun2 |
1. Department of Water Resources of Jiangsu Province, Nanjing, Jiangsu 210029, China; 2. Yangzhou University, Yangzhou, Jiangsu 225009, China |
|
|
Abstract The article presents the running system, mechanism and characteristic of the engineering of transforming water from the Yangtze river to the north of Jiangsu province in brief. According to the practice of the engineering in recent decade, the article analyses the structure and developing trend of the cost of water pumping (CWP), and counts the accumulative CWP per cubic meter elementarily. Meanwhile, the article puts forward the approach and measure on how to improve the economical and technical targets of transforming water from long distance. All these research will lead to further study on the cost of water transforming with large multi-drainage-area engineering and establish the dynamic water-price model.
|
Received: 07 August 2013
|
|
|
|
[1] 中华人民共和国水利部.南水北调总体规划[M].南京:江苏省水利厅,2002:50-61[2] 《江苏省地方志》编纂委员会.江苏水利志[M].南京:江苏古籍出版社,2001:294-311[3] 江苏省水文水资源勘测局.京杭运河输水损失测验总报告[R].南京:江苏省水利厅,2000:11-14 |
|
|
|