Water filling and emptying process of pipeline with combined air valve |
ZHENG Yuan-1, XUE Chao-2, ZHOU Da-Qing-1 |
(1.College of Energy and Electrical Engineering, Hohai University, Nanjing, Jiangsu 210098, China; 2.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing, Jiangsu 210098, China) |
|
|
Abstract In order to research the air pressure changes in water filling and emptying process of a long distance pressuredpipeline,sectional treatment and ordinal water filling and water emptying were adopted according to the characteristics of the pressuredpipeline.For each segment of the circular pipe,a mathematical model which involved the relationship between the water volume and water depth was established.On the basis of the definite positions of air valves and drain pipes as well as with the principle of small flow filling, the ideal equation concerning with the characteristics of air valve were calculated by Fortran programmed code for the various flow rates of both water filling and water emptying.The results show that the greater flow rate of the water filling and water emptying,the higher and lower the corresponding air pressure,and the higher risk of the pipe.The greater flow rate of water filling and water emptying should be accepted on the premise that the pipe is safe.The final filling flow rate is 16 m3/s,and the drain valves are full opening during water emptying process.
|
Received: 17 August 2010
Published: 30 January 2012
|
|
|
|
参考文献(References)[1]蒋国富.国外跨流域调水经验对我国南水北调中线工程的启示[J].世界地理研究,2006,15(4):35-40.Jiang Guofu.Enlightment of transboundary region water diversion in foreign countries to the SouthtoNorth Water Diversion Project in the middle line[J].World Regional Studies,2006,15(4):35-40.(in Chinese)[2]广东省水利厅.东深供水工程支撑香港繁荣发展 推进粤港紧密合作[J].中国水利,2009(18):140-141.Water Resources Department of Guangdong Province.Dongshen water supply project[CD1]Support the development of Hongkong and promote the cooperation between Guangdong and Hongkong[J].China Water Resources,2009(18):140-141.(in Chinese)[3]马骏,郑垂勇.南水北调工程价值链管理研究[J].水利经济,2006,24(5):1-3.Ma Jun,Zheng Chuiyong.Researches on value chain management of SouthtoNorth Water Transfer Project in China[J].Journal of Economics of Water Resources,2006,24(5):1-3.(in Chinese)[4]许晓辉,张晓梅,魏长勇,等.大伙房水库输水工程水资源优化配置模型的分析与研究[J].安徽农业科学,2006,34(11):2618-2620.Xu Xiaohui,Zhang Xiaomei,Wei Changyong,et al.The analysis and studies on optimal allocation of water resources model of water distribution project of Dahuofang reservoir[J].Journal of Anhui Agricultural Sciences,2006,34(11):2618-2620.(in Chinese)[5]Zhao M,Ghidaoui M S,Kolyshkin A A.Perturbation dynamics in unsteady pipe flows[J].Journal of Fluid Mechanics,2007,570:129-154.[6]Wylie E B,Streeter V L.Fluid Transients[M].New York: McGrawHill,1978.[7]杨敏,李强,李琳,等.有压管道充水过程数值模拟[J].水利学报,2007,38(2):171-175.Yang Min,Li Qiang,Li Lin,et al.Numerical simulation of waterfilling process in pressure conduit[J].Journal of Hydraulic Engineering,2007,38(2): 171-175.(in Chinese)[8]刘志勇,刘梅清.空气阀水锤防护特性的主要影响参数分析及优化[J].农业机械学报,2009,40(6):85-89.Liu Zhiyong,Liu Meiqing.Analysis and optimization of main influencing parameters for waterhammer prevention characteristic of air valves[J].Transactions of the Chinese Society for Agricultural Machinery,2009,40(6):85-89.(in Chinese)[9]胡建永,方杰,张健,等.空气阀在长距离输水系统中的水锤防止作用[J].人民长江,2008,39(1):63-65.Hu Jianyong,Fang Jie,Zhang Jian,et al.The protection efficiency of water hammer by air valve in longdistance conveyance system[J].Yangtze River,2008,39(1):63-65.(in Chinese)[10]AWWA.Concrete Pressure Pipe[M].USA: AWWA,1995.[11]袁丹青,陈向阳,白滨,等.水力机械空化空蚀问题的研究进展[J].排灌机械,2009,27(4):269-272.Yuan Danqing,Chen Xiangyang,Bai Bin,et al.Research progress of cavitation and erosion in hydraulic machinery[J].Drainage and Irrigation Machinery,2009,27(4):269-272.(in Chinese) |
|
|
|