Achievements and Analysis of Pump Model Unit Test for the Pump Station in the East Line of the Project of South-to-North Water Transfers |
GUAN Xing-fan, WU Jie, ZHU Quan-rong |
Jiangsu University, Zhenjiang, Jiangsu 212013; The Design Academy of Huaihe River Water Conservancy Commission, Bengbu, Anhui 233001; Wuxi Pump Manufacturing Company Limited, Wuxi, Jiangsu 214023, China |
|
|
Abstract The achievements of unit test of pump models in pump stations of Wannian Xia, Jietai, Liushan, Taier Zhuang et al. were presented. The analysis results of them and their tests on single pumps show that, there are great difference between them, the blade angle on the best efficient point is larger by 2%-4%, and the efficiency of single pump is higher than that of pump unit by 8%-10%, and the water head of pump unit with the best efficiency approximately equal to those of single pumps, and with the scope of ?5%.These difference have not been grasped qualitatively, in this case, choosing pump according to the test results of pump units is better than that of single pump, which can improve the reliability.
|
Received: 08 August 2013
|
|
|
|
[1] 关醒凡.系列轴流泵模型试验研究成果报告[J].排灌机械,2005(4)[2] 关醒凡,等.南水北调工程大型轴流泵选型中值得注意的几个问题[J].水泵技术,2002(2)[3] 关醒凡.能为南水北调工程做点力所能及的工作是我有生最大的愿望[J].通用机械,2004(1)[4] 关醒凡,等.大型轴流泵汽蚀与选型的关系[J].通用机械,2002(11)[5] 何成连.水利部南水北调工程水泵模型同台测试报告[R].天津:天津中水北方设计院,2005[6] 何成连.万年闸站水泵模型装置试验报告[R].天津:天津中水北方设计院,2005[7] 郑源.刘山站水泵模型装置试验报告[R].南京:河海大学,2005[8] 陆林广.台儿庄站水泵模型装置试验报告[R].扬州:扬州大学,2005 |
|
|
|