|
|
Researching on the Measures of Technical Modification of Feixian′s Pumping Station |
WANG Yan-en, LI Nian-guo |
Shandong Vocational College of Water Conservancy, Rizhao 276825, China |
|
|
Abstract There exists many problems such as the aging of mechanical and electrical equipment, improporly matching and low efficiency, etc, in Feixian′s pumping station which was built many years ago.Through improving the lift pump, changing the rotational speed and the vane′s angle of repose, and improving pipe arrangement, we can achieve better results with as efficiency increased and operating cost lowered.
|
Received: 08 August 2013
|
|
|
|
[1] 武汉水利电力学院.水泵及水泵站[M].北京:水利电力出版社,1981[2] 佚名.小型机电排灌站[M].南昌:江西人民出版社,1983[3] 蔺长增,蒋广庆,郭延杰.低扬程泵站的节能技术改造[J].排灌机械,2000,18(3):10-12 |
|
|
|