|
|
Experiment on improving flow pattern of diversion canal of Jiangdu pumping station |
TANG Zheng-jun |
Jiangdu Water Conservancy Engineering Administration Division, Jiangdu, Jiangsu 225200, China |
|
|
Abstract To solve the problems of harmful intake flow patterns affecting the pumping system characteristics and safe operation of pumping station,the author improved the intake flow patterns by adopting the method of modeling test with a 1∶50 model of Jingdu pumping station including the east sluice,west sluice and the diversion canals of 4 pumping stations.Based on Froude criterion,the intake flow pattern can be modeled accurately by increasing flow velocity properly.By setting a reverse "Y" guide baffle and a floor sill,the large scale swilling flow and sedimentation in diversion canal were reduced.It provides a good intake flow condition for the safe and economic operation of pumping station.pumping station;diversion canal;flow pattern;improvement;modeling test
|
Received: 08 August 2013
|
|
|
|
[1] 刘超.水泵及水泵站[M].北京:科学技术文献出版社,2003:30-31[2] 周济人,刘超.泵站复杂前池内的流态改善研究[J].江苏农学院学报,1998,19(4):93-96[3] 周济人,刘超.大型泵站前池水流流态的模拟[J].水利水电技术,1996(9):41-43[4] 陈卫平.谏壁泵站改造进出水流道设计方案试验研究[J].排灌机械,2006,24(3):17-19 |
|
|
|