Controlling the installing quality of overhang-well-vertical-draw out core pumping set |
KAN Yong-geng |
JiangDu water project administer department of Jiangsu province, Jiangsu, Jiangsu 225200, China |
|
|
Abstract Because the structure of the overhang-well-vertical pumping set is different from the traditional pumping set,it is not able to assure the quality of installing and repairing according to the standard demand.In order to assure the quality of the installing of the set and to avoid the trouble and deviant phenomena at work,taking the type of 64LKXA-24.5 standing pumping set as example,in allusion to the particularity of the structure of the overhang-well vertical draw out core pumping set,combining with the existent question and peculiarity in the course of installing,the main installing method of the pumps was intruduced,and the corresponding notice was given.
|
Received: 08 August 2013
|
|
|
|
[1] .SL 317-2004.泵站安装及验收规范[S].[2] .GB 8564-1988.水轮发电动机安装技术规范[S].[3] .GB/T 50265-1997.泵站设计规范[S].[4] 杜刚海.大型泵站机组安装与检修[M].北京:水利电力出版社,1994:57-71[5] 江苏省江都水利工程管理处.江都排灌站[M].北京:水利电力出版社,1979:421-468[6] B Ф 切巴耶夫斯基.泵站设计与抽水装置试验[M].北京:水利电力出版社,1990:107-110[7] 石玉广.影响泵站设备维修质量原因分析与对策[J].排灌机械,2004,22(5):43-45[8] 肖庆荣,葛秀成,游玉萍.循环泵运行故障分析及排除[J].排灌机械,2004,22(1):47-48[9] 阚永庚,周思年,黄爱忠.大型立式循环水泵电动机轴承甩油成因及对策[J].水泵技术,2001(2):34-36 |
|
|
|