Abstract:The low-head pump equipment and its hydraulic performance in south-north water transfer project is explained, and the country status question in this field is analyzed. Before building South-North transfer project into the world toping project, the pumping station project should be building into the world toping project firstly. Then the assess target of low-head pump equipment in south-north water transfer project is pointed out from the reality of the country pumping project field. This supplies reference to the design, building, checking and accept of the east line of south-north water transfer project.
刘超. 南水北调低扬程水泵装置水力性能考核指标探讨[J]. 排灌机械工程学报, 2003, 21(6): 2-5.
LIU Chao. Hydraulic Performance Assess Target Research of Low-head Pump Equipment inSouth-North Water Transfer Project. Journal of Drainage and Irrigation Machinery Engin, 2003, 21(6): 2-5.