排灌机械工程学报
   首页  学报介绍  编 委 会  投稿须知  留  言  English 
排灌机械工程学报  2006, Vol. 24 Issue (1): 1-7    DOI: 10.3969/j.issn.1674-8530.2006.01.001
最新目录| 下期目录| 过刊浏览| 高级检索 |
南水北调东线已招标泵站水泵模型装置试验成果及分析
关醒凡1;伍杰2;朱泉荣3
江苏大学,江苏,镇江,212013
Achievements and Analysis of Pump Model Unit Test for the Pump Station in the East Line of the Project of South-to-North Water Transfers
GUAN Xing-fan, WU Jie, ZHU Quan-rong
Jiangsu University, Zhenjiang, Jiangsu 212013; The Design Academy of Huaihe River Water Conservancy Commission, Bengbu, Anhui 233001; Wuxi Pump Manufacturing Company Limited, Wuxi, Jiangsu 214023, China

江苏大学梦溪校区(镇江市梦溪园巷30号)图书馆5楼 0511-84440893 传真0511--84440033
Copyright 江苏大学杂志社 2010-2015 All Rights Reserved